Case Studies

Case Studies

Results 1 - 2 of 2

Information Saves $100K Annually Plus $1 Million Cost Avoidance

When a metal manufacturing plant in the northeast was forced to consider a substation upgrade totaling nearly $1 million, information from their PowerLogic system convinced the company to simply switch loads to three other existing substations with sufficient capacity, turning a major capital expense into a very minor project.

Download this case study >>


Power Factor Correction Banks Help Steel Mill

Large Steel Mill facilities require relatively large amounts of reactive power to operate. Resultant low network efficiency decreases effective network capacity, creates overloads of network distribution equipment, and inflates Utility bills with low power factor penalties.

Download this case study >>