Case Studies

Results 1 - 2 of 2

Computer Manufacturer Cuts Energy Costs 20% Using Power Management Equipment

A global supplier of computing and imaging solutions, facing forced utility cutbacks needed a means to quickly shed non-essential electrical loads to avoid a total shutdown. By implementing a system that could shed 15% of the total connected electrical load, within 15 minutes after receiving a call from their local utility, forced outages could be avoided and thus preserve critical power needs.

Download this case study >>


TEXAS INSTRUMENTS MEXICO

 

MEXICO'S NATIONAL PRIZE FOR CONSERVATION OF ELECTRIC POWER

Download this case study >>