Case Studies

Case Studies

Results 1 - 3 of 3

U.S. Air Force Base Addresses Unique Needs with Advanced Power Management

The power management needs of Edwards Air Force Base are not ordinary. Located in the Mojave Desert, the massive campus covers 301,000 acres, or roughly 470 square miles

 

Edwards receives high voltage power of 115kV from the utility and distributes it to its buildings and tenants, such as NASA. In 2003, a PowerLogic
® power monitoring system from Schneider Electric was installed to help monitor and manage the high voltage electrical distribution system and usage within its facilities. The PowerLogic® system, with System Manager™ software (SMS), receives, records and analyzes data provided by more than 100 Square D® brand power meters and circuit monitors throughout the base.

Download this case study >>


Metering Project Drives Energy Efficiency for Air Force Base Medical Services

When it comes to the United States Air Force Medical Service (AFMS), the mission always comes first. But that can be a challenge, particularly when the AFMS offers medical service to more than 2.63 million eligible beneficiaries, including active duty personnel, family members and retirees, at 62 campuses nationwide, including dozens of hospitals, medical centers and clinics.

Download this case study >>


Pentagon Decides on Square D POWERLINK For Major Renovation Program

The Pentagon, headquarters of the United States Department of Defense, is moving forward with the Pentagon Renovation Program (PENREN), a seven-phase, 20-year, $1.2 billion project. Square D, a division of Schneider Electric, was awarded many of the more than 300 individual contracts required for this massive renovation project.

Download this case study >>